Street Café Licence 1-10 sq metres annual (one off) |
£350 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Street Café Licence 10-15 sq metres annual (one off) |
£395 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Street Café Licence 15-20 sq metres annual (one off) |
£450 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Annual charge for Renewal of Street Café Licence |
£125 |
Per licence |
Annual renewal of licence required for the placing of tables and chairs on the highway in connection with licensed premises. The combination of a lower than average renewal fee would support responsible operators, to continue trading as a café, bar or restaurant on a public pavement. |
Street Café Licence - change of Licensee |
£125 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Street Café Licence - Change to the extent of the licensed area 1-10 sq metres |
£350 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Street Café Licence - Change to the extent of the licensed area 15 sq metres or more |
£395 |
Per licence |
Licence required for the placing of tables and chairs on the highway in connection with licensed or other food and drink premises. Note: A licence is issued to an individual who is in attendance at the premise, rather than to a premise, partnership or company. It is not transferable to another person. |
Charge for Use of Patio heaters (each) |
£75 |
Per heater |
Environmental levy as the premises will no longer conform to energy efficiency policies. |
Traffic Management or Development Control related request letters by Solicitors and other organisations. |
£225 |
Per letter |
Charge applies to solicitors applying on behalf of clients requiring information about traffic management arrangements and other related information, usually as part of an insurance claim following a road traffic accident. These are applicable as the some requests for additional information fall outside the remit of Con29 enquiries. |
Temporary Order for planned works on or adjacent to the highway |
£2400 |
Per order |
Temporary Traffic Regulation Order; Includes temporary road closures and other restrictions to facilitate works on or adjacent to the highway. Any orders requiring additional advertising beyond standard costs may be subject to additional charges. |
Temporary Notice for unplanned or short duration works on or adjacent to the highway |
£890 |
Per notice |
For emergency works and short duration restrictions only. This includes temporary road closures and other restrictions, (Traffic Management planning) |
Notice of Event - Single Advert Only |
£1250 |
Per notice |
This includes temporary road closures and other restrictions to facilitate works on or adjacent to the highway. (Traffic Management planning). |
Licence for Temporary signs on the Highway (Maximum duration 6 months) |
£350 |
Per licence |
This could include directional signage to housing developments, private premises, land etc. Maximum 6 months. |
Retrospective Licence and fixed penalty for Temporary signs on the Highway without authorisation or Licence |
£500 |
Per licence |
This is a fixed penalty processed as a Retrospective Licence in locations where Licence conditions are met. This process incurs additional administration cost and inspection fees that are recoverable. It is intended that this charge will act as a deterrent and improve developer, retailer and other contractor performance who have a duty to observe the law. This will also enable the Council to identify and prosecute those illegally advertising on the highway or take other enforcement measure when necessary. |
Switching off (including bagging over) and on of Signalised Junctions or Pedestrian Crossing |
£485 |
Per instance |
Charge to promoters of street and road works for switching on and off permanent traffic signals as part of on-site traffic management. Separate charge applies to both switch off and switch on. |
Weekend and out of hours switching off (including bagging over) and on of Signalised Junctions or Pedestrian Crossing |
£600 |
Per instance |
Out of hours charge to promoters of street and road works for switching on and off permanent traffic signals as part of on-site traffic management. Separate charge applies to both switch off and switch on. |
Late notice within 24 hours switching off (including bagging over) and on of Signalised Junctions or Pedestrian Crossing |
£720 |
Per instance |
Out of hours charge to promoters of street and road works for switching on and off permanent traffic signals as part of on-site traffic management. Separate charge applies to both switch off and switch on. |
Aborted charge for switching off (including bagging over) or on of Signalised Junctions or Pedestrian Crossing |
£240 |
Per instance |
Aborted charge to promoters of street and road works for switching on and off permanent traffic signals as part of on-site traffic management. |
Signalised Junctions phasing or similar information request letters by Solicitors and other organisations. |
£170
|
Per letter |
Charge applies to solicitors applying on behalf of clients requiring information about traffic signal phasing and other related information, usually as part of an insurance claim following a road traffic accident. |
NRSWA S50 Licence (every 200 metres)(Existing apparatus) |
£575 |
Per licence |
Licence to allow existing private apparatus to be maintained and improved in the public highway. |
NRSWA S50 Licence (every 200 metres) (New apparatus) |
£925 |
Per licence |
Licence to allow private apparatus to be installed in the public highway. |
NRSWA S50 Licence (every 200 metres) (New apparatus) per additional 200m |
£150 |
per additional 200m |
Licence to allow private apparatus to be installed in the public highway. |
NRSWA S50 Licence (every 200 metres)(Trial Holes) |
£325 |
Per licence |
Licence to allow existing private apparatus to be maintained and improved in the public highway. |
NRSWA S50 Licence Paper Permit |
£100 |
Per licence |
Licence to allow existing private apparatus to be maintained and improved in the public highway. |
Section 278 Paper Permit |
£625 |
Per licence |
Licence to allow existing private apparatus to be maintained and improved in the public highway relating to S278 works |
NRSWA S171 Licence (every 200 metres)(Existing apparatus) |
£290 |
Per licence |
Licence to temporarily make an excavation in the public highway (trial hole). |
Scaffold / Hoarding Licence (1 month licence including renewal) min 5 working days notice |
£165 |
Per licence |
Licence to allow a developer or builder to place a scaffold on the public highway in accordance with the Terms and Conditions |
Scaffold / Hoarding Licence (3 month licence including renewal) |
£220 |
Per licence |
Licence to allow a developer or builder to place a
scaffold on the public highway in accordance with the Terms and Conditions. |
Retrospective Scaffolding and Hoarding Licence |
£360 |
Per licence |
This is a fixed penalty processed as a Retrospective Licence in locations where Licence conditions are met. This process incurs additional administration cost and inspection fees that are recoverable. It is intended that this charge will act as a deterrent and improve Contractor performance who have a duty to observe the law. This will also enable the Council to manage performance of those operators and take enforcement measure when necessary. |
Licence for Temporary Structures (Cabin / Container / Compound / Cherry Picker (1 month licence or 1 month renewal) |
£165 |
Per licence |
Licence to allow a temporary structure to be placed on the highway e.g. staging, gantries, banner frame, cherry picker, large screen TVs, small cranes. |
Licence for Cabin / Container / Compound / Cherry Picker (3 month licence or 3 month renewal) |
£220 |
Per licence |
Licence to allow a temporary structure to be placed on the highway e.g. staging, gantries, banner frame, cherry picker, large screen TVs, small cranes. |
Licence for Cabin / Container / Compound / Cherry Picker (retrospective) |
£360 |
Per licence |
Licence to allow a temporary structure to be placed on the highway e.g. staging, gantries, banner frame, cherry picker, large screen TVs, small cranes. |
Licence for Crane over-sail/mobile (1 month licence or 1 month renewal) minimum 5 working days notice |
£165 |
Per licence |
Licence issued to allow cranes and other plant to project onto the public highway. |
Licence for Crane over-sail/mobile (3 month licence or 3 month renewal) minimum 5 working days notice |
£220 |
Per licence |
Licence issued to allow cranes and other plant to project onto the public highway. |
Licence for Crane over-sail/mobile (retrospective) |
£360 |
Per licence |
Licence issued to allow cranes and other plant to project onto the public highway. |
License for deposit of Building Materials on the Highway - minimum 3 working days' notice |
£75 |
Per licence |
The combination of a lower than average initial fee and a penalty fee would support responsible operators, working mainly for householders undertaking home improvements. |
License for deposit of Building Materials on the Highway (online application) - minimum 3 working days' notice |
£75 |
Per licence |
The combination of a lower than average initial fee and a penalty fee would support responsible operators, working mainly for householders undertaking home improvements. |
License for deposit of Building Materials on the Highway (Retrospective) |
£225 |
Per licence |
Processed as a Retrospective Licence in locations where Licence conditions are met, this process incurs additional admin cost and inspection fees that is recoverable. It is intended that this charge will act as a deterrent and improve both Building trade and Contractor performance who have a duty to observe the law. This will also enable the Council to manage performance of those operators and take enforcement measure when necessary. |
Fee for return of items confiscated from the highway (goods, A frame boards etc.) |
£135 |
(Full cost if greater than £135) |
Administration fee and officer time chargeable when enforcement action has been taken. This applies to all goods, material and equipment placed on the Highway without a Licence. Other costs like collection and delivery of the goods will be chargeable in addition to this fee. |
Skip charges/ permit (new) 3 days’ notice required. |
£55 |
Per licence |
14 day only Licence to allow a skip in connection with building and other such work to be placed on the public highway in accordance with the Terms and Conditions |
Skip charges/ permit requiring Express approval fee 3-day turnaround |
£60 |
Per licence |
In accordance with the Terms and Conditions |
Skip permit extension Maximum 14 days |
£45 |
Per licence |
In accordance with the Terms and Conditions |
Skip permits Retrospective charges (penalty) |
£225 |
Per licence |
Processed as a Retrospective Licence in locations where Licence conditions are met. This process incurs additional administration cost and inspection fees that are recoverable. It is intended that this charge will act as a deterrent and improve both Building trade and Contractor performance who have a duty to observe the law. This will also enable the Council to manage performance of those operators and take enforcement measure when necessary. |
Road Safety Audit |
Contact the Traffic Management Team for a quote |
Per audit |
None |
Road Safety Check |
£140 |
Per audit |
None |
SLA - School Crossing Patrols |
£7166 |
Per item |
None |